https://ak3.sarpras.unair.ac.id/assets/rekomendasi/ https://sdm.unpad.ac.id/-/contact/ https://bce.unpad.ac.id/top/ https://pendfisika.ulm.ac.id/wp-content/thai/ https://sapasko.kemenpora.go.id/ https://ak3.sarpras.unair.ac.id/assets/berita/ https://lms.stmik-dci.ac.id/blog/cache/ https://elitbang.depok.go.id/user/sbo/ http://p4m.pnl.ac.id/ https://pastiberaksi.sulselprov.go.id/ https://elitbang.depok.go.id/ https://wonosari.bondowosokab.go.id/pelayanan/ slot gacor situs slot gacor pertanian.bondowosokab.go.id/ https://elitbang.depok.go.id/assets/ https://simaster.wonosobokab.go.id/obc4d/ https://cms-bpsdubm.kemenkumham.go.id/json/ https://elakip2023.slemankab.go.id/modules/obc4d/ https://kinerja.iainambon.ac.id/ https://corinnemartin.com/ https://thedevilsrejects.com/ https://www.ehazira.net/ https://henantwinespirits.com/ https://majormagnetgame.com/ https://grunkamunka.com/ https://villatente.com/ https://exper-tr.com/ https://bkd.iainambon.ac.id/assets/ https://mi.aikom.ac.id/assets/ https://www.gorevdeyukselmesinavi.com.tr/ https://bkad.bengkuluutarakab.go.id/wp-content/themes/ https://compchem.ub.ac.id/ https://pastiberaksi.sulselprov.go.id/sgacor/ https://lihtr.unair.ac.id/assets/ https://geliatairlangga.unair.ac.id/toto/ https://e-kkn.unila.ac.id/assets/ https://simlp2mv2.unm.ac.id/gacor/ https://e-kkn.unila.ac.id/gacor/ https://e-kkn.unila.ac.id/about/ https://pafirembang.com/ https://pafijaktim.org/ https://pafislawi.org/ https://pafilasem.org/ https://dinkes.bondowosokab.go.id/dinkes/x777/ https://guvenlunapark.com/ https://pafikediri.com/
PERANCANGAN PLTS SEBAGAI SUMBER ENERGI LISTRIK PADA KANTOR ENERGI DAN SUMBER DAYA MINERAL PROPINSI SULAWESI TENGAH | Asse | FORISTEK : Forum Teknik Elektro dan Teknologi Informasi

PERANCANGAN PLTS SEBAGAI SUMBER ENERGI LISTRIK PADA KANTOR ENERGI DAN SUMBER DAYA MINERAL PROPINSI SULAWESI TENGAH

Ambo Asse, Mery Subito, Yusnaini Arifin

Abstract


One of the technologies that utilizes solar energy in delivering electric energy is
photovoltaic (PV) system. It converts solar energy into electric energy directly which is environmental friendly, non-pollution, not taking fossil fuel and low cost maintenance. Mineral Resources (ESDM) is one of the offices which uses PV system in Palu municipality. However, only 3 AC powered by non battery-PV
is used in ESDM. In the future, ESDM have planned to add the capacity of PV system to supply the other AC. The objective of this study was to design PLTS system for supplying other AC and lighting especially in evening. In this
case, sun panel capacity, battery, BCR, and inventers will be determined. This study also aims giving information about investment cost which is needed by PLTS with battery without battery and PLN. The calculation in this study used data from BMKG Meteorology Station Palu and Mineral Sources (ESDM) office of Central Sulawesi. The results showed that the capacity power for supplying Air Conditioner charge and lighting in evening was 122,54 kWh, where the systems
voltage was 120 volt. moreover, the number of sun panel was 40 unit with capacity 200 Wp, 15 unit for battery with capacities 24v 1000Ah.

Keyword : Photovoltaic design, Battery, BCR, Inverter, Early Investment


Full Text:

Untitled

Refbacks

  • There are currently no refbacks.